Ledger notes

Short paper for a buried system.

No myth-busting blog. Just the few things that change whether you pump, inspect, or stop using the field.

Pumping is not an inspection

A pumper can empty a tank and leave baffles, the outlet tee, and the field unexamined. Ask for sludge depth, scum thickness, and a note on the baffles. If those numbers are not on the receipt, you bought a vacuum truck, not a diagnosis.

The three-year default

For an occupied three-bedroom house with ordinary use, a three-year pump interval is a defensible rule of thumb. Add a disposal, a rental, or a fourth bedroom and pull it in. Stretching to six or eight years is how solids walk into the laterals.

What a buyer should demand

Lids located and opened. Sludge measured. Field walked. Limitations written down (buried D-box, no access, snow cover). A seller who offers a pump receipt from last spring is offering maintenance, not condition.

Design standards are a stack, not a pamphlet

EPA publishes the OWTS manual. States set gallons and setbacks. The county stamps the plan, and may be stricter. Table 1 flow, Table 3 tanks, Table 2 setbacks, Table 4A perc, and the 75-A.8 / .9 siting tests live in Design standards. They are a briefing for the permit conversation, not the permit.

Questions we actually get

No. It is a structured interview that scores what you know about the system. A real inspection opens lids, measures sludge, and walks the field. Use the audit to decide how fast to book that visit.

Still guessing?

Run the ten-question ledger. If the score says lids off, book the visit.